Advertisment

Hyperloop Transportation Technologies presents pre-feasibility study to the Andhra Pradesh Government to set up HyperloopTT system

Hyperloop Transportation Technologies presented the pre-feasibility route study to a packed audience from the state Capital Region Development Authority.

author-image
DQC Bureau
Updated On
New Update
Hyperloop Transportation Technologies

Hyperloop Transportation Technologies presented the pre-feasibility route study to a packed audience from the state Capital Region Development Authority (APCRDA) and other nodal state departments.

Advertisment

The meeting was attended by senior government officials including, Shri. Ajay Jain, Principal Secretary, Energy Infrastructure and Investment Department, Shri. J Krishna Kishore, CEO, Andhra Pradesh Economic Development Board, Dr Sreedhar Cherukuri, Commissioner, Capital Region Development Authority, Shri. N Balasubramanyam, Transport Commissioner amongst others.

The HyperloopTT team was represented by BibopGresta, Chairman & Co-founder, HyperloopTT, Joel Michael, India Head, HyperloopTT and Dr.SabihKhisaf, Head of Engineering (the Middle East & North Africa), Hyperloop TT.

HyperloopTT has associated with Aarvee Associates of Hyderabad to prepare the pre-feasibility and feasibility studies.

Advertisment

HyperloopTT has proposed setting up the Hyperloop Transportation system connecting Anantapura-Amaravati-Vijayawada and Visakhapatnam as part of(around 700-800 kilometre) integrated Public Transit system. The entire project is conceived to be implemented in 3 phases.

In Phase I&II, A commercial Hyperloop System between Amaravati and Vijayawada will be built. In Phase III, A commercial Hyperloop System covering either northern or Southern section of the vision corridor connecting Anantapur-Amaravati-Vijayawada and Visakhapatnam will be built.

However, Phase II & III are interchangeable and can be implemented at the same time. The Phase I alignment will be located in either Amaravati or in Vijayawada city running East-West on a 5-10km straight section to showcase the benefits of the system to the stakeholders and the general public.

HTT has also proposed setting up a manufacturing complex that will focus on several aspects of the Hyperloop TT project, such as; building the Tube, capsule, the track and 3D printing.

Speaking on the pre-feasibility report presentation, Shri. Ajay Jain, Principal secretary energy Infrastructure and Investment Department, said, “The proposed capital city of Amaravati would house 3.5 million people and create 1.5 million jobs. The plan also proposes 9 theme-based cities within the capital city to serve as the hub of activities serving unique functions and employment generation along with complementary functions. Given the population of 3.5 million people, the total travel demand for the city is estimated to be around 4 million motorised trips by 2050. In addition, 10% of these trips will be commuter trips to other parts of AP. Another 10% of trips will come from floating population who travel into the city for various purposes. These totals to approximately 800,000 daily commuter trips. To support this requirement, there is a need for the sustainable high-quality robust mass transportation system”

andhra-pradesh-government hyperloop-transportation-technologies capital-region-development-authority apcrda hyperlooptt-system
Advertisment