Mundra: Invensys Operations Management announced that it has signed a US multi-million dollar deal with Coastal Gujarat Power Limited, a wholly owned subsidiary of Tata Power Limited, to provide end-to-end integrated services and solutions that will fully optimize the power plant. Located in Mundra in Gujarat, it will be India's largest coal-fired power plant when completed in 2013.
Under the terms of the agreement, Invensys will provide distributed and critical control systems, emergency shutdown systems, advanced process control, plant optimization and operator training simulator technology. The scope of the project includes the provision of end-to-end solutions, from boiler management systems to turbine auxiliary controls, with interfaces for seamless systems integration with other technology vendors.
/dqc/media/agency_attachments/3bO5lX4bneNNijz3HbB7.jpg)
Follow Us